ultrabay batteries - bad by design?

Performance, hardware, software, general buying and gaming discussion..
Post Reply
Message
Author
zhenya
Junior Member
Junior Member
Posts: 251
Joined: Sat Apr 08, 2006 10:56 pm
Location: Ithaca, NY

ultrabay batteries - bad by design?

#1 Post by zhenya » Thu Sep 21, 2006 7:56 am

Several months ago I purchased a second battery for my z60t to fit in the ultrabay slim. I quickly became aware of the fact that when running on battery, the default setting is to completely run down the ultrabay battery before switching to the main battery. I immediately realized this was probably bad news for the life of the battery, because deep discharge cycles will quickly shorten the life of a lithium ion battery. I then watched over the last few months as this battery quickly deteriorated as expected. It is now at just 64% capacity with just 30 cycles on it. I called Lenovo, and they sent out a new battery with no hassles, but I can't help think that I'm only going to see the same pattern repeated. Have others had this same problem? Is there a hidden setting somewhere I haven't come across to determine at what discharge level to move to the 2nd battery (and even better, in what order to use them, as I'd prefer it used the main battery first!)?

Dead1nside
Senior Member
Senior Member
Posts: 780
Joined: Mon Jul 24, 2006 8:32 pm
Location: Reading, UK
Contact:

#2 Post by Dead1nside » Thu Sep 21, 2006 10:56 am

I remember having an argument with one of the more established members of the board about this. He was saying how this is not a design fault and such, and I was saying it doesn't take much effort to allow customisation of which is to be discharged. It was largely a circular argument... I still think I'm right though :)

I have heard reported that if you eject it and pop it back in that it will discharge the main battery first. Look on thinkwiki.org under the ultrabay battery.
T41p 2373-GHG / 1.5Ghz 'Banias' / NMB Keyboard
T61 14.1'' 7661-CTO / Vista Business / WXGA / T7300 / 2GB RAM / 80GB HDD / X3100 / 3945ABG / NMB KB /
T400 14.1'' 2768-CTO / Vista Business / WXGA / P8400 / 4GB RAM / 200GB 7200RPM / HD 3470 / 5300AGN / WWAN / NMB KB

christopher_wolf
Special Member
Posts: 5741
Joined: Sat Oct 08, 2005 1:24 pm
Location: UC Berkeley, California
Contact:

#3 Post by christopher_wolf » Thu Sep 21, 2006 1:05 pm

I have had my Ultrabay Slim battery since as long as I have hadmy T43 and I have yet to have any problems with it. It would be, however, nice if one could choose which battery to start discharging first. Deep cycling it can be avoided by tweaking thresholds and ejecting it when it gets near 0% charge. :)
IBM ThinkPad T43 Model 2668-72U 14.1" SXGA+ 1GB |IBM 701c

~o/
I met someone who looks a lot like you.
She does the things you do.
But she is an IBM.
/~o ---ELO from "Yours Truly 2059"

zhenya
Junior Member
Junior Member
Posts: 251
Joined: Sat Apr 08, 2006 10:56 pm
Location: Ithaca, NY

#4 Post by zhenya » Thu Sep 21, 2006 1:19 pm

which thresholds would I tweak? I can set the option to warn/hibernate the computer at a certain percentage left, but that only affects the 'entire system battery' which, as the power management program sees it, is both batteries combined. It still discharges the ultrabay slim battery all the way to zero without giving any notification either. So even to pop it out before it reaches zero would require me manually checking up on it!

nelson
Freshman Member
Posts: 53
Joined: Tue Aug 01, 2006 1:52 pm
Location: San Francisco, CA, USA

#5 Post by nelson » Fri Sep 22, 2006 2:01 am

I've wondered the same thing about running the Ultrabay battery down first. Over on the T60 forum, we're having a discussion of everyone posting about how quickly their batteries start losing the ability to hold a charge. There's definitely a serious problem with them. The only good news is Lenovo seems quick with sending out replacements under warranty.

davidspalding
ThinkPadder
ThinkPadder
Posts: 1593
Joined: Mon Nov 14, 2005 2:39 pm
Location: Durham, NC
Contact:

This deserves a re-think (on my part, at least)

#6 Post by davidspalding » Sun Oct 01, 2006 12:41 pm

Interesting.... I hadn't thought about how fast an Ultrabay Slim battery would wear down under these circumstances. Considering the MSRP of these, one oughtn't consider them "disposable" (use and lose within 1 year)....

Checking Power Manager, my first battery* (bought 11/2005) is at 67% capacity after 157 cycles. I don't know if this is because I only recently started draining my Ultrabay batts to 0% recently, or.... This makes me want to check on the warranty again.

* I have 3 Ultrabay Slim batteries.
2668-75U T43, 2GB RAM, 2nd hand NMB kybd, Dock II, spare Mini-Dock, and spare Port Replicators. Wacom BT tablet. Ultrabay 2nd HDD.
2672-KBU X32, 1.5GB RAM, 7200 rpm TravelStar HDD.

Post Reply
  • Similar Topics
    Replies
    Views
    Last post

Return to “Thinkpad - General HARDWARE/SOFTWARE questions”

Who is online

Users browsing this forum: No registered users and 5 guests