1st Thinkpad
Posted: Mon Aug 27, 2007 12:04 pm
I ordered a fully loaded T61p WUVGA/T7500 on 7/19/07 with a ship date of 8/21/07. On 8/21/07 my ship date changed to 9/21/2007. I called and they said the delay was because of constraints with the WUVGA screens but that my T61p should ship sooner than that.
Who knows at this point?
I run OpenSuse 10.2 and this will replace my HP z5000.
Who knows at this point?
I run OpenSuse 10.2 and this will replace my HP z5000.